Preform Terminology

AWIS PREFORM: PREFORM TERMINOLOGY

RETROREFLECTIVITY:

Means- Light source bounces back to the eye of the person viewing it

RELATIVE LIFE COST

Example:

The cost of paint Say $25.00 per m²
The cost of Preform Say $40.00 per m²

The perform will last approximately 6 years plus at a cost of $40.00
Therefore the paint in real terms is three (3) times the cost of Preform

THERMOPLASTIC STRUCTURE
Hydro Carbon (AWIS Preform) – this product does not require the road surface to be pre-heated prior to installation.

STANDARDS
AWIS Preform and its ingredients used in its manufacture complies with:

  • AS 4049.2
  • R141 RTA – 3357
  • R141 RTA – 3353

ADDITIONAL SAVINGS

  • LARGE SAVINGS IN REDUCION OF LABOUR TIME TO INSTAL
  • LARGE SAVINGS IN REDUCTION OF ROAD TRAFFIC CONTROL
    COSTS.
  • PURCHASING DIRECTLY FROM THE MANUFACTURERS
  • REDUCING POTENTIAL LIABILITIES FROM INSURANCE CLAIMS
    IF PEOPLE CLAIM TO HAVE SLIPPED ON PAINTED SURFACES.
Categories: ,

Description

We are the manufacturers, We can fabricate, to your councils Water Authorities requirements.
Just call for a quote.

There are no reviews yet.

Be the first to review “Preform Terminology”

Your email address will not be published. Required fields are marked *